Additional Storage Building in Nuneaton

nuneaton case study

Steel Buildings were contacted by a customer in Nuneaton that had found themselves in an urgent situation and needed additional storage.  In 4 weeks the customer would have thousands of pounds worth of timber that needed to be stored on a dry place.  Before speaking to Steel Buildings it was in danger of being left outside for a period of time, running the risk of the weather making the product un-usable.

Steel Buildings supplied a structure 10 metres wide x 18 metres long x 3 metre to eaves complete with an Industrial Roller door and Personnel access door supplied and installed in just under 3 weeks.

nuneaton case study outside during

nuneaton case study outside finished