BT Madley Case Study

We provided a much needed addition stores facility and BT in Herefordshire. The new steel building was placed on an existing pad. The new steel frame meant valuable communication equipment was being stored outside affecting the equipment’s look and condition.

bt-madley-3

The small stores supplied were 12 metres long x 6 metres wide x 3 metres. With a 3.2 metres x 2.5 metre industrial roller door situated in the gable, and a steel security door positioned on the side elevation.

The steel Structure was erected in 2 days and the building was clad and doors installed within 5 days.

The client has already identified other areas on the site for further steel Storage buildings.